The next phase of the Phillipsburg Industrial Park is underway. Petillo’s heavy construction team is working on demolition, site excavation, clearing and levelling in preparations for the foundations of the following two warehouses; Building 1 (1,408,200 sq. ft.) and Building 4 (262,500 sq. ft.). The material movement has been kept to a minimum throughout this project with the aid of the Propeller Platform and Propeller PPK, enabling Petillo to track materials with Drone collected data.